Adnams plc - Gallery 30 May 2007: Difference between revisions

From Brewery History Society Wiki
Jump to navigation Jump to search
No edit summary
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
<gallery>
<gallery>
File:DSCF5596.JPG|A metre has been added to the height of the building to the right of the Adnams signage - notice the slightly darker brickwork and window in the roof compared to the 26 June 2001 photos
File:DSCF5600.JPG|The corner with Victoria Street has been tidied up and a full height window installed
File:DSCF5602.JPG|Entrance to the brewery yard
File:DSCF5605.JPG|The warehouse at Reydon - this is the loading bay side
File:DSCF5606.JPG|Loading vehicles from preassembled pallets
File:DSCF5608.JPG|Closing the curtain sides
File:DSCF5609.JPG|Inside the main warehouse area showing the two metre deep glulam beams
File:DSCF5610.JPG|Incoming trailers arrive through an airlock to avoid temperature fluctuations
File:DSCF5611.JPG|Stock for the retail trade including CO<sup>2</sup> cylinders
File:DSCF5613.JPG|Detail of the glulam roof beams which are 48m long
File:DSCF5614.JPG|A fork lift truck loading a trunking trailer
File:DSCF5617.JPG|General view showing the warehouse construction
File:DSCF5619.JPG|The retail vehicle bays
File:DSCF5620.JPG|A trunking tractor and trailer
File:DSCF5624.JPG|A close up of the sedum green roof and two solar panels which provide 80% of the site's electricity needs even in sunny Southwold!
File:DSCF5624.JPG|A close up of the sedum green roof and two solar panels which provide 80% of the site's electricity needs even in sunny Southwold!
File:DSCF5625.JPG|Windblown grass seeds have settled amongst the sedum
File:DSCF5625.JPG|Windblown grass seeds have settled amongst the sedum
Line 17: Line 32:
File:DSCF5687.JPG|Another view of the remodelled brewery frontage - compare with 26 June 2001 view
File:DSCF5687.JPG|Another view of the remodelled brewery frontage - compare with 26 June 2001 view
File:DSCF5690.JPG|Brewery on the left and fermenting vessels on the right - there are now 19 compared to the nine back in 2001
File:DSCF5690.JPG|Brewery on the left and fermenting vessels on the right - there are now 19 compared to the nine back in 2001
File:DSCF5596.JPG|A metre has been added to the height of the building to the right of the Adnams signage - notice the slightly darker brickwork and window in the roof compared to the 26 June 2001 photos
 
File:DSCF5600.JPG|The corner with Victoria has been tidied up and a full height window installed
File:DSCF5602.JPG|Entrance to the brewery yard
File:DSCF5605.JPG|The warehouse at Reydon - this is the loading bay side
File:DSCF5606.JPG|Loading vehicles from preassembled pallets
File:DSCF5608.JPG|Closing the curtain sides
File:DSCF5609.JPG|Inside the main warehouse area showing the two metre deep glulam beams
File:DSCF5610.JPG|Incoming trailers arrive through an airlock to avoid temperature fluctuations
File:DSCF5611.JPG|Stock for the retail trade including CO2 cylinders
File:DSCF5613.JPG|Detail of the glulam roof beams which are 48m long
File:DSCF5614.JPG|A fork lift truck loading a trunking trailer
File:DSCF5617.JPG|General view showing the warehouse construction
File:DSCF5619.JPG|The retail vehicle bays
File:DSCF5620.JPG|A trunking tractor and trailer
</gallery>
</gallery>


[[category:Brewer & Distiller International Gallery]]
[[category:Brewer & Distiller International Gallery]]

Latest revision as of 16:33, 26 January 2022