Adnams plc - Gallery 30 May 2007: Difference between revisions

From Brewery History Society Wiki
Jump to navigation Jump to search
No edit summary
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
<gallery>
<gallery>
File:DSCF5624.JPG
File:DSCF5596.JPG|A metre has been added to the height of the building to the right of the Adnams signage - notice the slightly darker brickwork and window in the roof compared to the 26 June 2001 photos
File:DSCF5625.JPG
File:DSCF5600.JPG|The corner with Victoria Street has been tidied up and a full height window installed
File:DSCF5628.JPG
File:DSCF5602.JPG|Entrance to the brewery yard
File:DSCF5631.JPG
File:DSCF5605.JPG|The warehouse at Reydon - this is the loading bay side
File:DSCF5637.JPG
File:DSCF5606.JPG|Loading vehicles from preassembled pallets
File:DSCF5638.JPG
File:DSCF5608.JPG|Closing the curtain sides
File:DSCF5640.JPG
File:DSCF5609.JPG|Inside the main warehouse area showing the two metre deep glulam beams
File:DSCF5642.JPG
File:DSCF5610.JPG|Incoming trailers arrive through an airlock to avoid temperature fluctuations
File:DSCF5643.JPG
File:DSCF5611.JPG|Stock for the retail trade including CO<sup>2</sup> cylinders
File:DSCF5646.JPG
File:DSCF5613.JPG|Detail of the glulam roof beams which are 48m long
File:DSCF5649.JPG
File:DSCF5614.JPG|A fork lift truck loading a trunking trailer
File:DSCF5654.JPG
File:DSCF5617.JPG|General view showing the warehouse construction
File:DSCF5658.JPG
File:DSCF5619.JPG|The retail vehicle bays
File:DSCF5660.JPG
File:DSCF5620.JPG|A trunking tractor and trailer
File:DSCF5675.JPG
File:DSCF5624.JPG|A close up of the sedum green roof and two solar panels which provide 80% of the site's electricity needs even in sunny Southwold!
File:DSCF5687.JPG
File:DSCF5625.JPG|Windblown grass seeds have settled amongst the sedum
File:DSCF5690.JPG
File:DSCF5628.JPG|Close up of the laminated structure of the glulam beams
File:DSCF5596.JPG
File:DSCF5631.JPG|A view of the distribution offices in the end bay
File:DSCF5600.JPG
File:DSCF5637.JPG|The site effluent is dealt with through a reed bed system
File:DSCF5602.JPG
File:DSCF5638.JPG|General view of the site showing the warehouse on the right with vehicle maintenance and Tech Services offices on the left.
File:DSCF5605.JPG
File:DSCF5640.JPG|The new Huppmann brewhouse - the silo on the left feeds the wet mill
File:DSCF5606.JPG
File:DSCF5642.JPG|Looking down on the wet mill
File:DSCF5608.JPG
File:DSCF5643.JPG|The copper vapour heat is recovered in the heat exchanger on the left
File:DSCF5609.JPG
File:DSCF5646.JPG|Head Brewer Mike Powell Evans with his new plaything
File:DSCF5610.JPG
File:DSCF5649.JPG|Another view of the copper vapour heat recovery equipment
File:DSCF5611.JPG
File:DSCF5654.JPG|Wort from the lauter tun is collected in a pre-run tank and heated to almost boiling on its way to the copper using this heat exchanger
File:DSCF5613.JPG
File:DSCF5658.JPG|There are four pots for adding hops, salts and copper finings. A flow of wort collects the solids from the pots to add them to the process
File:DSCF5614.JPG
File:DSCF5660.JPG|Underneath the 5.2m diameter lauter tun - the large pipes feed the mash in and the 'spokes' collect the wort to a central point. The green bit is part of the central spindle which moves up and down and circulates the raking arms.
File:DSCF5617.JPG
File:DSCF5675.JPG|Two spent grains silos - two these days as the law demands they must be in place cleaned
File:DSCF5619.JPG
File:DSCF5687.JPG|Another view of the remodelled brewery frontage - compare with 26 June 2001 view
File:DSCF5620.JPG
File:DSCF5690.JPG|Brewery on the left and fermenting vessels on the right - there are now 19 compared to the nine back in 2001
 
</gallery>
</gallery>
DSCF5596 A metre has been added to the height of the building to the right of the Adnams signage - notice the slightly darker brickwork and window in the roof compared to the 26 June 2001 photos
 
DSCF5600 The corner with Victoria has been tidied up and a full height window installed
DSCF5602 Entrance to the brewery yard
DSCF5605 The warehouse at Reydon - this is the loading bay side
DSCF5606 Loading vehicles from preassembled pallets
DSCF5608 Closing the curtain sides
DSCF5609 Inside the main warehouse area showing the two metre deep glulam beams
DSCF5610 Incoming trailers arrive through an airlock to avoid temperature fluctuations
DSCF5611 Stock for the retail trade including CO2 cylinders
DSCF5613 Detail of the glulam roof beams which are 48m long
DSCF5614 A fork lift truck loading a trunking trailer
DSCF5617 General view showing the warehouse construction
DSCF5619 The retail vehicle bays
DSCF5620 A trunking tractor and trailer
DSCF5624 A close up of the sedum green roof and two solar panels which provide 80% of the site's elecricity needs even in sunny Southwold!
DSCF5625 Windblown grass seeds have settled amongst the sedum
DSCF5628 Close up of the laminated structure of the glulam beams
DSCF5631 A view of the distribution offices in the end bay
DSCF5637 The site effluent is dealt with through a reed bed system
DSCF5638 General view of the site showing the warehouse on the right with vehicle maintenance and Tech Services offices on the left.
DSCF5640 The new Huppmann brewhouse - the silo on the left feeds the wet mill
DSCF5642 Looking down on the wet mill
DSCF5643 The copper vapour heat is recovered in the heat exchanger on the left
DSCF5646 Head Brewer Mike Powell Evans with his new plaything
DSCF5649 Another view of the copper vapour heat recovery equipment
DSCF5654 Wort from the lauter tun is collected in a pre-run tank and heated to almost boiling on its way to the copper using this heat exchanger
DSCF5658 There are four pots for adding hops, salts and copper finings. A flow of wort collects the solids from the pots to add them to the process
DSCF5660 Underneath the 5.2m diameter lauter tun - the large pipes feed the mash in and the 'spokes' collect the wort to a central point. The green bit is part of the central spindle which moves up and down and circulates the raking arms.
DSCF5675 Two spent grains silos - two these days as the law demands they must be in place cleaned
DSCF5687 Another view of the remodelled brewery frontage - compare with 26 June 2001 view
DSCF5690 Brewery on the left and fermenting vessels on the right - there are now 19 compared to the nine back in 2001
[[category:Brewer & Distiller International Gallery]]
[[category:Brewer & Distiller International Gallery]]

Latest revision as of 16:33, 26 January 2022